
Photo Gallery 2008:
Faults: Gas & Heating faults photo gallery
Click here to return to main gallery
Click here to return to Faults
gallery
Click on images below to enlarge
 |
 |
Copper to lead pipe soldered joint. Not to current
standard |
End of gas pipe not sealed with approved fitting |
 |
 |
End of gas pipe not sealed with approved fitting 2 |
Incorrect flue allowed products of combustion to leak
back into air intake. Caused overheating |
 |
 |
Incorrect flue allowed products of combustion to leak
back into air intake. Caused overheating 2 |
Lack of servicing caused boiler to explode |
 |
 |
Lack of servicing caused boiler to explode 2 |
Lack of servicing caused boiler to explode 3 |
 |
 |
Lack of servicing caused boiler to explode 4 |
Lack of servicing caused boiler to explode 5 |
 |
 |
Leaking electric flow boiler replaced |
Leaking electric flow boiler replaced 2 |
 |
 |
Original lead gas pipe |
Poor solder work damaged electrical bond and meter
box. Duct not sealed |
 |
 |
Poor solder work damaged electrical bond and meter
box. Duct not sealed 2 |
Uncliped gas pipe run to Combi in loft in 15mm. Undersized
should be 22mm |
 |
 |
The largest meter box in the world 1 |
The largest meter box in the world 2 |