Initial verification 1 |
Initial verification 2 |
 |
 |
Initial verification 3 |
Inspection 10mm Main bond to gas 1 |
 |
 |
Inspection 10mm Main bond to gas 2 |
Inspection 10mm Main bond to water |
 |
 |
Inspection 16mm Meter tails |
Inspection Checking supplementary bonding under bathroom
floor |
 |
 |
Inspection Checking the condition of conductors behind
accessory 1 |
Inspection Checking the condition of conductors behind
accessory 2 |
 |
 |
Inspection Checking the condition of conductors |
Inspection Checking the conductors under the fuse carriers |
 |
 |
Inspection Checking the size of the suppliers fuse
for earthing arrangements |
Inspection Consumer unit outdoors watertight so not
a fault 1 |
 |
 |
Inspection Consumer unit outdoors watertight so not
a fault 2 |
Inspection exposing the conductors 1 |
 |
 |
Inspection exposing the conductors 2 |
Inspection Incoming supply and suppliers 100A fuse |
 |
 |
Inspection Investigating behind accessories 1 |
Inspection Investigating behind accessories 2 |
 |
 |
Inspection Looking for flora or fauna that might cause
damage |
Inspection Noting the quality of the installation |
 |
 |
Inspection Noting ware and damage to installation |
Inspection Preparing conductors for testing |
 |
 |
Inspection Preparing to test after main supply isolated
due to exposed conductors |
Inspection The consumer unit |
 |
 |
Inspection The earthing arrangements |
Testing Checking for loop impedance on final ring Zs |
 |
 |
Testing Checking for loop impedance Zs |
Testing Conducting a Ze test |
 |
 |
Testing First stage of final ring test taking end to
end readings of r1 |
Testing First stage of final ring test taking end to
end readings of rn |
 |
 |
Testing Last stage of final ring test taking R1 + R2
readings 1 |
Testing Preparing to take a R1 + R2 reading |
 |
 |
Testing Taking a reading from a lighting circuit |
Testing Taking a Zs reading using an adaptor 1 |
 |
 |
Testing Taking a Zs reading using an adaptor 2 |
Testing Taking a Zs reading using an adaptor 3 |
 |
 |
Testing Taking an R1 + R2 reading notice earth bar
connection |
Fault 60 year old accessory still live |
 |
 |
Fault 60 year old cable still live |
Fault Cable not supported |
 |
 |
Fault Exposed conductive part 1 |
Fault Exposed conductive part 2 |
 |
 |
Fault Exposed conductive part 3 |
Fault Exposed conductive part |
 |
 |
Fault Exposed conductive parts |
Fault Fitting not correctly supported 1 |
 |
 |
Fault Fitting not correctly supported 2 |
Fault Fitting not correctly supported 3 |
 |
 |
Fault Fitting not suitable for zone |
Fault Fitting Not suitable for zone 2 |
 |
 |
Fault Incorrect termination of live part 1 |
Fault Incorrect termination of live part 2 |
 |
 |
Fault limited access to accessory |
Fault Line conductor incorrectly marked as CPC |
 |
 |
Fault Overloaded sockets 1 |
Fault Overloaded sockets 2 |
 |
 |
Fault Overloaded sockets 3 |
Fault Overloaded sockets 4 |
 |
 |
Fault Overloaded sockets 5 |
Fault Potential damage to live conductor taped to heating
flow pipe and main bonding conductor |
 |
 |
Fault Signs of overheating |
Fault Signs of overheating 3 |
 |
 |
Fault Smoke detector removed and not linked |
Report A four page document to be completed at the
office |
 |
|
Report Recording observations and test results |
|