
Photo Gallery 2008:
Commercial: Hotel and Catering
Click here to return to main gallery
Click here to return to Commercial
gallery
Click on images below to enlarge
 |
 |
Corner unit |
Damaged tiles 1 |
 |
 |
Damaged tiles 2 |
Damaged tiles 3 |
 |
 |
Damages tiles 4 |
Fixing a store cupboard door |
 |
 |
Hand wash |
Kitchen light in need of replacement |
 |
 |
Kitchen swing door |
Local repairs to floor |
 |
 |
New wooden floor |
Repairs to a waiters station |
 |
 |
Repairs to prep area |
Repairs to tiled skirting |
 |
 |
Repairs to woodwork |
Replacing a section of wooden flooring |
 |
 |
Replacing hinges on cupboards |
Replacing wooden trim on bar |
 |
 |
Replacing wooden trim on bar 2 |
Restaurant tables |
 |
 |
Restaurant urinals |
Servery hatch |
 |
 |
Taps in need of replacement |
The wash up |
 |
 |
Washroom facilities |
Washroom ready for decorating |
 |
 |
1. The existing tranisition strip |
2. Step cleaned |
 |
 |
3. Measuring the side pieces |
4. Marking out the side pieces |
 |
 |
5. Fitting the transition strip |
6. New transition strip in place |
 |
|
7. Transition strip |
|